-
2021 Water Rate Study
Sodium and Chloride Loading Study for the MVD WHPA’s.
-
Barr Engineering Co Report for MVD Supply Wells 4 and 5
-
Emery & Garrett Groundwater: Final Report – Preliminary Evaluation of The Feasibility to Artificially Recharge the Aquifer at the MVD-4 And MVD-5 Well Field
-
2018 Water Rate Study
-
Asset Management Plan (Final 11/2014)
-
Information from the 2/25/19 Public Hearing
-
Underwood Engineers Presentation – ‘Evaluation of PFAS Treatment Wells 2, 3, 7, & 8′
-VIDEO PRESENTATION
-SLIDESHOW ONLY -
Rosemarie Rung Presentation –
‘Petition Warrant Articles: Filtering Merrimack’s Water’
-VIDEO PRESENTATION
-SLIDESHOW ONLY
-